Rearranging Dispatching Layout to Minimize Dispatching Time
DOI:
https://doi.org/10.33021/jie.v3i2.523Abstract
Reorganizing a layout entails a massive adjustment and thorough planning is essential before a new layout implemented. This project is to reorganize layout at dispatching area of a manufacturing industry which produces apparel accessories products. Current arrangement at the dispatching area of the company shows an interrupted flow path of activities and scattered of queuing cartons at area of activities in the dispatching line which brought to operating issues. The project aims to identify problem in current arrangement of dispatching layout, analyze the the problem and propose an alternative layout that reduces dispatching time. Time studies were applied to collect data on current performance, developing alternative arrangement, and evaluation the alternative through Witness simulation. The finding showed total dispatching time of current layout consumes 30.77 minutes to complete one dispatching job with distance travel of 162.83 meters. Better alternative layout is developed by the approach of facility planning process. Results showed the dispatching time has reduced by 32.79%, which the alternative layout only consumes 20.68 minutes to complete one dispatching job with shorter distance travel of 109.44 meters.
References
M. Khoshnevisan, S. Bhattacharya, and F. Smarandache. (2003). “Optimal Plant Layout Design for Process-focused Systems.”
T. M. Chen, C. C. Chen, S. P. Chuang. (2010). “A Simulated Annealing-based Approach for Dynamic Facility Planning Department of Vehicle Engineering”, National Taipei University of Technology, Taipei, Taiwan, Department of Information Management, Huafan University, Taipei, Taiwan, pp. 1291.
R. D. Meller, and K. Y. Gau. (1996). “The Facility Layout Problem: Recent and Emerging Trends and Perspectives”, Journal of Manufacturing Systems, vol. 15, no. 5, pp. 1 - 16.
T. Ertay, and D. Ruan. (2006). “Integrating Data Envelopment Analysis and Analytic Hierarchy for the Facility Layout Design in Manufacturing Systems”, Information Sciences 176, pp. 237 - 262.
A. Drira, H. Pierreval, and S. Hajri-Gabouj. (2007). “Facility Layout Problems: A Survey.” Annual Reviews in Control, pp. 255-267.
A. B. Thai. (2006). “Evaluation of Using Swarm Intelligence to Produce Facility Layout Solutions”, University of Louisville, pp. 11-12.
M. A. El-Baz. (2004). “A Genetic Algorithm For Facility Layout Problems Of Different Manufacturing Environments”, Computers & Industrial Engineering, pp. 233 - 246.
J. Tompkins, Y. Bozer, E. Frazelle, J. Tanchoco, and J. Trevino. (2003). “Facility Planning”, John Wiley and Sons, New York.
H. Huang. (2003). “Facility Layout Using Layout Modules”, The Ohio State University.
L. Yang, J. Deuse, and M. Droste. (2011). “Energy Efficiency at Energy Intensive Factory - A Facility Planning Approach”, Chair of Industrial Engineering, TU Dortmund University, Dortmund, Germany, pp. 699.
E. S. Grajo. (1996). “Strategic Layout Planning and Simulation for Lean Manufacturing a Layout Tutorial”, In Proceedings of the 1995 Winter Simulation Conference, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, pp. 564-568.
E. E. Aleisa, and L. Lin. (2005). “For Effective Facilities Planning: Layout Optimization Then Simulation, Or Vice Versa”, Proceedings of the 2005 Winter Simulation Conference, pp. 1381-1383.
J. Banks, J.S. Carson, B.L. Nelson and D.M. Nicol. (2010). “Discrete-Event System Simulation”, Pearson, 5th ed.
R.G. Ingalls. (2002). “Introduction to Simulation”, Proceedings of the Winter Simulation Conference.
Downloads
Additional Files
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).




