Application of Lean Manufacturing to Minimize Production Cycle Time in the Aluminum Furniture Division

Muhammad Ilwas fathyudha, Indro Prakoso, Ayu Anggraeni Sibarani

Abstract


The production process efficiency is the company's ability to produce optimal output using available resources. When carrying out the production process of aluminium furniture, PT Rajawali Perkasa Furnitur (RPF) has a significantly long cycle time, which results in low efficiency or can be said to be experiencing wastefulness. Through the implementation of lean manufacturing using Value Stream Mapping (VSM) and Process Activity Mapping (PAM) methods, this study aims to minimize the cycle time. The production process of aluminium furniture includes (1) cutting, (2) bending, (3) assembly, (4) leveling, (5) QC, (6) Treatment, (7) powder coating, (8) weaving, (9) touch up, (10) inspect, and (11) packaging. The total cycle time for these processes is 13.431 seconds. Based on the research, it is found that there are 3 non-value-added activities, namely 2 activities in the weaving process and 1 activity in the packaging process. The elimination of these 3 activities results in a reduction of the cycle time by 464 seconds to 12.967 seconds.


Keywords


production efficiency, cycle time, production process, waste, lean manufacturing, value stream mapping, process activity mapping

Full Text:

PDF

References


Salim, Zamroni., & Mundadi, Ernawati. (2017). Info Komoditi Furnitur Badan Pengkajian dan Pengembangan Perdagangan Kementerian Perdagangan Republik Indonesia.

Mohammadiy, Zul Fathi Fuad. (2020). Minimasi Cycle Time Proses Produksi Mebel Berdasar Pendekatan Lean Manufacturing Dengan Menggunakan Metode Value Stream Mapping (VSM). Dari https://dspace.uii.ac.id/bitstream/handle/123456789/29226/15522232%20Zul%20Fathi%20Fuad%20M.pdf?sequence=1&isAllowed=y

Ristyowati, T., Muhsin, A., & Nurani, P. P. (2017). MINIMASI WASTE PADA AKTIVITAS PROSES PRODUKSI DENGAN KONSEP LEAN MANUFACTURING (Studi Kasus di PT. Sport Glove Indonesia). Jurnal OPSI Vol 10 No 1

Hardianza, Dicky Arif. (2017). IMPLEMENTATION OF LEAN MANUFACTURING METHOD VALUE STREAM MAPPING IN PT.X. TESIS – PM 147501.

Pusdatin Kemenperin. (2022). Peran Strategis dan Potensi Penguatan Industri Furnitur Terhadap Perekonomian Nasional. Kementerian Perindustrian Republik Indonesia.

Gasperz, V., & fontana, A. (2011). Lean Six Sigma For Manufacturing and Service Industries. Bogor: Vinchiristo Publication.

Gaspersz, V. (2007). Lean Six Sigma for manufacturing and service industries. Jakarta: Gramedia Pustaka Utama

Hines, P., & Rich, N. (1997). The Seven Value Stream Mapping Tools . International Journal of Operations and Production Management , 46-64.

Gasperz, V. (2013). All-in-one Integrated Total Quality Talent Management. Jakarta: PT. Percetakan DKU.

Satao, M. S. (2012). Enhancing waste reduction through lean manufacturing tools and techniques, a methodical step in the territory of green manufacturing. International Journal of Research in Management and Technologiy, 2249 – 9563.

Liker, Jeffrey K. (2014). Der Toyota Weg: 14 Managementprinzipien des weltweit erfolgreichsten Automobilkonzerns. German: Finanzbuch Verlag.

Lee, Q. dan Snyder, B. (2007). Value Stream and Process Mapping. Enna Products Corporation, Bellingham.

Hines, Peter., Et. Al. (1998). Value Stream Management. The International Journal of Logistics Management 25-42.




DOI: http://dx.doi.org/10.33021/jie.v9i1.4848

DOI (PDF): http://dx.doi.org/10.33021/jie.v9i1.4848.g1939

Refbacks

  • There are currently no refbacks.



Articles in this journal have been indexed in major research databases, including:


Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.