POTENSI GAMAL (Gliricidia sepium) SEBAGAI BAHAN BAKU PEMBANGKIT LISTRIK TENAGA BIOMASSA STUDI KASUS : KABUPATEN MANGGARAI TIMUR (NTT)

Dedi Hudaedi, Hariyadi Hariyadi, Syaiful Anwar

Abstract


The ability of East Manggarai Regency to meet the electricity needs of the region is estimated at only 44.91%. This metter is caused by natural conditions that have a dry climate and critical land, making it difficult to can improve of community economy and generaly region for development of adequate electricity. Therefore, the electrical energi need has been to development challenge, while fossil energi untenable. The construction of a biomass from the Gamal (Gliricidia sepium) plant is a potential alternative to develop. This research aimed to identify the potential lands for Gamal and predict the electricity potency. The method was image analysis from Citra TM 8 using GIS Version 10.1 as an analysis tool. Collecting data was through community interviews with purposive sampling method. The results of this study described the degraded land areas of 187.462,01 hectares which are the potential land for Gamal planting. Prediction of critical lands could produce 98 181.76 m3 of wood products and generate 18.90 MW / year of electricity.


Keywords


electricity; degraded lands; Gliricidia sepium; power plant

Full Text:

PDF

References


Ahmad NR. 2016. Sumber Daya Hutan Untuk Energi Terbarukan. Makalah disampaikan dalam Kongres Kehutanan Indonesia-IV tanggal 29 November – 2 Desember 2016 Hotel Grand Sahid Jaya Jakarta.MAPEBHI.

[BI] Bank Indonesia (2009). Kajian ekonomi regional Provinsi Nusa Tenggara Timur Triwulan II-2012. Kupang.

[BP-PEN] Badan Pengkajian Pengembangan Energi Nasional (2006). Blueprint Pengelolaan energi Nasional 2006-2025. Jakarta, Indonesia.

[BPPT] badan Pengkajian Penerapan Teknologi (2016). Outlook Energi Indonesia 2016. Badan Pengkajian dan Penerapan Teknologi. Jakarta.

Cahyono, T. D., Coto, Z., & Febrianto, F. (2008). Analisis Nilai Kalor Dan Kelayakan Ekonomis Kayu Sebagai Bahan Bakar. Forum Pascasarjana, 31(2), 105–116.

Chirwa W.P., Black R.C., Ong K.C., Maghembe M. 2006. Nitrogen dynamics in cropping systems in southern Malawi containing Gliricidia sepium, pigeonpea and maize. Agroforestry Systems (2006) 67:93–106.

[DESDM] Departemen Energi dan Sumber Daya Mineral (2006). Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 482-12/40/600.2/2006 tentang Penetapan Kondisi Krisis Penyediaan Tenaga Listrik, Jakarta. Indonesia.

Elevitch, Craig R. Francis, J. K. (2005). Gliricidia sepium. Traditional Tree Iniciative, 1(Figura 2), 461–471.

[ESDM] Energi Sumber Daya Mineral (2015). Renstra Direktorat Jenderal Ketenagalistrikan 2015-2019. Jakarta, Indonesia.

German, Laura. Ramisch, Joshua J. Verma, R.(2010). Beyond the Biofisical: knowledge, Culture and Power in Agriculture and Natural Resource. (R. German, Laura. Ramisch, Joshua J . Verma, Ed.). Bogor, Indonesia.

Hargiardana, O. (2013). Krisis Listrik dan Program 35 Ribu MW. M&E, 13(2), 17–25.

Lassa, J., Mau, Y. S., Li, D. E., & Frans, N. (2014). Impact of Climate Change on Agriculture and Food Crops: Options for Climate Smart Agriculture and Local Adaptation in East Nusa Tenggara, Kupang. Indonesia. Newspaper Irgsc (8):2339-06381.

McKendry, P. (2002). Energi production from biomass (part 1): overview of biomass. Bioresource Technol, 83(1), 37–46.

Njurumana, Gerson ND. Victorino, B. P. (2008). Potensi Pengembangan Mamar sebagai Model Hutan Rakyat Dalam Rehabilitasi Lahan Kritis di Timor Barat. Jurnal Penelitian Hutan Dan Konservasi Alam, V.(5): 473–484.

Nulik J., Hau J.K., 2016. Tanaman Gamal (Gliricidia sepium) dan Potensi Pemanfaatannya Sebagai Pakan ternak dan fungsi lainnya dalam usahatani di Nusa Tenggara Timur. Jurnal Balai Pengkajian Teknologi Pertanian (BPTP) NTT.

Pasaribu, S. M. (2007). Revitalizing Institutions To Enhance Climate Forecast Application in East Nusa Tenggara. Analisa Kebijakan Pertanian, 5(3), 239–253.

[Perpres] Peraturan Presiden Republik Indonesia (2017). Rencana Umum energi Nasional dalam Lampiran Peraturan Presiden Republik Indonesia Nomor 22 Tahun 2017, Pub. L. No. 22 Tahun 2017 (2017). Indonesia.

[PLN] Perusahaan Listrik Negara (2016). Statisitik Perusahaan Listrik Negara 2015. Jakarta, Indonesia.

[PLN] Perusahaan Listrik Negara (2017). Statistik Perusahaan Listrik Negara 2016. Jakarta, Indonesia.

Prakoso, A. B. (2014). Design and Optimization of Renewable energy Power Plant in Pengadangan Village Priggasela Sub District east Lombok District NTB. Gadjah Mada University.

Price, B. (1998). Electricity from biomass. London, England: Financial Times Energi.

Roliadi, H. D., & Anggraini, D. (2010). Eksploitasi Kayu Hutan Tanaman Industri Jenis Eucalyptus Hybrid sebagai Bahan Baku Pulp Kerta. Jurnal Penelitian Hasil Hutan, 28(4), 332–357.

Wolo, Adrianus. Winahju, W. S. (2009). Analisis Kebutuhan Listrik di Wilayah Nusa Tenggara Timur. (newspaper) Jurusan MIPA. Institut Teknologi Surabaya.




DOI: http://dx.doi.org/10.33021/jenv.v3i1.397

Copyright (c) 2018 Dedi Hudaedi, Hariyadi Hariyadi, Syaiful Anwar

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.


Journal of Environmental Engineering and Waste Management Published by PresUniv Press, in collaboration with IESA and APIK Indonesia Network