Pengurangan Waktu Proses Pembuatan Produk Cap (C1805-009): Suatu Pendekatan Simulasi
Abstract
Full Text:
PDFReferences
Harrel, C. Ghosh, B. & Bowdwn, R. 2012. Simulasi Using ProModel. New york: McGraw- Hill.
Mabert, V. A. dan Jacobs, F. R. 1991 Integrated production systems – Design planing, Control, and Scheduling, 4th Edition., Industrial and Management Press, Institute of Industrial Engineers, Georgia.
Shingo, Shigeo, 1990. A Study of the Toyota Production System. USA: Andrew P. Dillon Productivity Press.
Wignjosoebroto, S. 1992. Teknik Tata Letak Pabrik dan Pemindahan Bahan. Jakarta: Guna Widya.
Wiratno, S. E. Dkk. “Supply Chain Risk menagement”, Universitas Teknologi Yogyakarta, Indonesia.
DOI: http://dx.doi.org/10.33021/jie.v4i1.747
DOI (PDF): http://dx.doi.org/10.33021/jie.v4i1.747.g458
Refbacks
- There are currently no refbacks.
Articles in this journal have been indexed in major research databases, including:
This work is licensed under a Creative Commons Attribution 4.0 International License.