Antisipasi Keterlambatan Proyek Pembangunan Shelter dengan Menggunakan Metode What-If Analysis

Ineu Widaningsih, Anastasia Lidya Maukar, Avania Shinta

Abstract


The purpose of this study is to identify the delay in building shelter projects and activities that cause delays. This research will provide suggestions on steps to be taken to overcome delays. This research uses two methods of control, namely the "what-if analysis" method for solutions if there is a delay in the project, as well as a method of shortening the duration of critical paths Duration Crashing on critical infrastructure with the addition of workers or the application of overtime work as an alternative control were performed. Currently, the critical path has not been identified and there is no solution provided to overcome the problem of delays in shelter construction projects. The target duration of the construction of the shelter construction project is known for 14 days but it has been delayed into 35 days. The results of this study are findings of some critical activities that can cause delays and what-if analysis is done for time acceleration of 10% to 100%.
Keywords: What If analysis, Critical Path Method, shelter, Duration Crashing.


Full Text:

PDF

References


Ariany Frederika. (2010). Analisa Percepatan Pelaksanaan dengan Menambah Jam Kerja Optimum Pada Proyek Konstruksi, Universitas Udayana, Denpasar.

Goldratt, E.M. (1997). Critical Chain, The North River Press, Great Barrington, USA.

Hayun, Anggara. (2005). Perencanaan dan Pengendalian Proyek dengan Metode PERT – CPM: Studi kasus Fly Over Ahmad Yani, Journal The winners, Vol 6, No.2, h. 155-174, Karawang.

Maley. H Claude. (2012). Project Management Concepts, Methods, and Techiques, CRC Press

Hasyim, M Hamzah, dan Negara, Kartika Puspa. (2014). Antisipasi Keterlambatan Proyek Menggunakan Metode What If diterapkan pada Microsoft Project, Universitas Brawijaya, Semarang.

Ratna, A. S. (2008). Antisipasi Keterlambatan Proyek Kontruksi dengan Metode What if, Universitas Kristen Petra, Surabaya.

Setiawan, Ruben S, dan Sunarto. (1999). Analisa Percepatan Durasi Aktivitas Sebagai Antisipasi Keterlambatan Proyek. Universitas Kristen Petra, Surabaya.

Soeharto, Iman. (2002). Manajemen Proyek dari konseptual sampai Operasional, Erlangga, Jakarta.




DOI: http://dx.doi.org/10.33021/jie.v2i2.487

DOI (PDF): http://dx.doi.org/10.33021/jie.v2i2.487.g284

Refbacks

  • There are currently no refbacks.



Articles in this journal have been indexed in major research databases, including:


Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.