QUALITY IMPROVEMENT OF FAST MOVING PARTS PROCUREMENT WITH MULTI ATTRIBUTE FAILURE MODE ANALYSIS (MAFMA) IN A PETRO-CHEMICAL INDUSTRY

Dwi Kurniawan, Ghaista Yumna Margani

Abstract


This paper addressed the problem of high waiting time in a petro-chemical industry in Indonesia. According to Pareto diagram, the procurement process at the industry showed that the number of fast moving item transactions was more than 70% or 19,836 item transactions with 2,524 fast moving material items. The activity of making Purchase Requisition (PR) until the issuance of Purchase Order (PO) for fast moving items required a cycle time of 71.2 days. The highest waste was waiting with a weight of 0.248 and a total of 17 waste items from 27 sub-activities. The average value of sigma for 6 years was 1.79. The application of lean six sigma and MAFMA found that the dominant causes of waste were unfulfilled specified demand and long delivery time. We proposed improvements by enhancing monitoring processes and submitting a contract agreement for the procurement of fast moving spare parts.


Keywords


procurement; lean; Six Sigma; MAFMA; Waste

Full Text:

PDF

References


Braglia, M. (2000). MAFMA: multi‐attribute failure mode analysis. International Journal of Quality & Reliability Management. 17(0), 1017-1033. DOI:10.1108/02656710010353885

Gasperz, V. (2005). Lean Sigma Approach. Jakarta: Penerbit Erlangga.

Hetharia, D. (2009). Penerapan Fuzzy Analytic Hierarchy Process Dalam Metode Multi Attribute Failure Mode Analysis Untuk Mengidentifikasi Penyebab Kegagalan Potensial Pada Proses Produksi. J@ti UNDIP: Jurnal Teknik Industri, 4(2), 106-113. DOI: https://doi.org/10.12777/jati.4.2.91-98

Hines, P., & Rich, N. (1997). The seven value stream mapping tools. International journal of operations & production management.

Ilangkumaran, M., Periyasamy, S., & Gnanasekaran, S. (2014). Failure mode and effect analysis using fuzzy analytic hierarchy process. International Journal of Productivity and Quality Management, 14(3), 296. doi:DOI:10.1504/IJPQM.2014.064807

Khan, N. (2018). How it is done: procurement cycle and procedures. In Public Procurement Fundamentals. Emerald Publishing Limited.

Kotler, P., & Keller, K. L. (2008). Marketing strategy. London: Business Forum,

Pujawan, I. N., & Er, M. M. (2017). Supply chain management. Andi.

Siahaya, W. (2012). Manajemen Pengadaan Procurement Management. Bandung: Alfabeta.

Stamatis, D. H. (2003). Failure mode and effect analysis: FMEA from theory to execution. Quality Press.

Ulfah, M., Trenggonowati, D., Ekawati, R., & Ramadhania, S. (2019). The proposed improvements to minimize potential failures using lean Six Sigma and multi-attribute failure mode analysis approaches. IOP Conference Series: Materials Science and Engineering, 673 012082, DOI 10.1088/1757-899X/673/1/012082

Yamit, Z. (2013). Manajemen Kualitas Produk & Jasa. Yogyakarta: Ekonisia.




DOI: http://dx.doi.org/10.33021/jie.v8i2.4671

DOI (PDF): http://dx.doi.org/10.33021/jie.v8i2.4671.g1679

Refbacks

  • There are currently no refbacks.



Articles in this journal have been indexed in major research databases, including:


Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.