Improving Spare Part Storage to Reduce Searching Time by Implementing 5S

Hirawati Oemar, Dea Legina Ayu Kusumah, Hery Hamdi Azwir

Abstract


 

 

PT XYZ is a company in publishing, printing, security printing, and general trading. This company uses many large machines to carry out the production process so the spare parts used to support the machine are many types. A large number of types of spare parts is a problem for the company because the storage of spare parts in the company has not been neatly arranged, there is no data collection for incoming and outgoing spare parts, and old and new spare parts are not separated, spare parts are not arranged according to type, there are no special marks on the storage area, and there is spare parts packaging waste in the storage area. This causes technicians to have difficulty when looking for spare parts and causes waste of movement. This study aims to improve the spare parts storage area by minimizing movement waste so that technicians can easily find spare parts. An Analysis of spare parts storage was carried out using a process flow chart and improvements with the application of the 5S method (Seiri, Seiton, Seiso, Seiketsu, and Shitsuke). The application of the 5S method to the spare parts storage area at PT XYZ can regulate the work environment and minimize the time for taking spare parts from 218 minutes to 159 minutes.

 


Keywords


Storage, Spare Parts, Process Flow Chart, 5S, Waste of Motion

Full Text:

PDF

References


Arifin, A., dan Limbong, B. (2016). Sistem Informasi Perhitungan Suku Cadang (Sparepart) Dalam Satu Mesin Produksi, Jurnal Sisfotek Global, 6(2), 76-83. http://journal.stmikglobal.ac.id/index.php/sisfotek/article/download/105/pdf.

Carreira, B. (2005). Lean Manufacturing That Works. New York: American Management Association.

Ehrlich, B.H. (2002). Transactional Six Sigma and Lean Servicing, Transactional Six Sigma and Lean Servicing. London: CRC Press LCC.

Farihah, T., dan Krisdiyanto, D. (2018). Penerapan 5S (Seiri, Seiso, Seiton, Sheiketsu, Shitsuke) pada UKM Olahan Makanan di Dusun Sempu, Desa Wonokerto, Jurnal Bakti Saintek: Jurnal Pengabdian Masyarakat Bidang Sains dan Teknologi, 2(2), 43-49. http://ejournal.uin-suka.ac.id/saintek/jbs/article/view/1260

Handra, N., dan Brazi. (2012). Pengaruh Posisi Baut Galvanis Dan Stainless Steel Ditinjau Dari Fracture Surface Pada Sambungan Plat, Jurnal Teknik Mesin, 2(1), 26-34. https://ejournal.itp.ac.id/index.php/tmesin/article/view/69

Masryukan., Ngafwan., dan Nugroho, T.S. (2017). Perbandingan Kualitas Material Bearing Merk Skf, jurnal ilmiah teknik mesin Universitas Muhamadiyah Surakarta, 18(2), 91-99. http://journals.ums.ac.id/index.php/mesin/article/download/5241/3479

Mayasari, H.E., dan Dewi, I.R. (2016). Kajian Standar Sabuk-V Karet Untuk Motor Matik Review of Rubber V-Belt Standard for Automatic Motorcycles, Prosiding Seminar Nasional Kulit, Karet, dan Plastik, Yogyakarta: 26 Oktober 2016. http://www.bbkkp.go.id/ojs/prosiding

Mubarok, R. (2018). Pelaksanaan Ringkas, Rapi, Resik, Rawat, Rajin (5R) Bengkel Teknik Kendaraan Ringan Smk Muhammadiyah Pakem Dalam Mewujudkan Sekolah Berbasis Industri, Tugas Akhir, Jurusan Teknik Industri, Universitas Negeri Yogyakarta. https://eprints.uny.ac.id/61126/

Putra, I.E., dan Haris, M. (2017). Analisa sistem pneumatik alat pemotong serat alam, Jurnal Momentum, 19(2), 50-56. https://ejournal.itp.ac.id/index.php/momentum/article

Rosa, F., Rodiawan., dan Suhendra, T. (2016). Rancang Bangun Fixture Dalam Proses Pengenduran Mur Centrifugal Oil Cleaner Di Pltd Merawang, Jurnal Teknik Mesin, 02(1), 12-18. https://journal.ubb.ac.id/index.php/machine/article

Saleh, M., dan Haryanti, M. (2017). Rancang Bangun Sistem Keamanan Rumah Menggunakan Relay, Jurnal Teknik Elektro, 8(3), 181-186. http://publikasi.mercubuana.ac.id

Sudarmadi, D. (2011). Prosedur Penyimpanan Barang Spare Part Untuk Mesin Produksi Di Pt. Coca–Cola Amatil Indonesia Central Java, Tugas Akhir, Universitas Negeri Semarang. https://lib.unnes.ac.id/9835/

Sutalaksana, I.Z., Anggawisastra, R., dan Tjakraatmadja, J.H. (2006). Teknik Perancagan Sistem Kerja. Edisi Kedua. Bandung: Institut Teknologi Bandung.

Voehl, F., Harrington, H.J., Mignosa, C., dan Charron, R. (2013). The lean six sigma black belt handbook: Tools and methods for process acceleration. London: CRC Press. https://www.pdfdrive.com/the-lean-six-sigma-black-belt-handbook-tools-and-methods-for-process-acceleration-e157817752.html




DOI: http://dx.doi.org/10.33021/jie.v7i1.3685

DOI (PDF): http://dx.doi.org/10.33021/jie.v7i1.3685.g1166

Refbacks

  • There are currently no refbacks.



Articles in this journal have been indexed in major research databases, including:


Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.