Rearranging Dispatching Layout to Minimize Dispatching Time

A. Saptari, A. Azlan, E. Mohamad

Abstract


Reorganizing a layout entails a massive adjustment and thorough planning is essential before a new layout implemented. This project is to reorganize layout at dispatching area of a manufacturing industry which produces apparel accessories products. Current arrangement at the dispatching area of the company shows an interrupted flow path of activities and scattered of queuing cartons at area of activities in the dispatching line which brought to operating issues. The project aims to identify problem in current arrangement of dispatching layout, analyze the the problem and propose an alternative layout that reduces dispatching time. Time studies were applied to collect data on current performance, developing alternative arrangement, and evaluation the alternative through Witness simulation. The finding showed total dispatching time of current layout consumes 30.77 minutes to complete one dispatching job with distance travel of 162.83 meters. Better alternative layout is developed by the approach of facility planning process. Results showed the dispatching time has reduced by 32.79%, which the alternative layout only consumes 20.68 minutes to complete one dispatching job with shorter distance travel of 109.44 meters.


Full Text:

PDF

References


M. Khoshnevisan, S. Bhattacharya, and F. Smarandache. (2003). “Optimal Plant Layout Design for Process-focused Systems”.

T. M. Chen, C. C. Chen, S. P. Chuang. (2010). “A Simulated Annealing-based Approach for Dynamic Facility Planning Department of Vehicle Engineering”, National Taipei University of Technology, Taipei, Taiwan, Department of Information Management, Huafan University, Taipei, Taiwan, pp. 1291.

R. D. Meller, and K. Y. Gau. (1996). “The Facility Layout Problem: Recent and Emerging Trends and Perspectives”, Journal of Manufacturing Systems, vol. 15, no. 5, pp. 1 – 16.

T. Ertay, and D. Ruan. (2006). “Integrating Data Envelopment Analysis and Analytic Hierarchy for the Facility Layout Design in Manufacturing Systems”, Information Sciences 176, pp. 237 – 262.

A. Drira, H. Pierreval, and S. Hajri-Gabouj. (2007). “Facility Layout Problems: A Survey”. Annual Reviews in Control, pp. 255–267.

A. B. Thai. (2006). “Evaluation of Using Swarm Intelligence to Produce Facility Layout Solutions”, University of Louisville, pp. 11-12.

M. A. El-Baz. (2004). “A Genetic Algorithm For Facility Layout Problems Of Different Manufacturing Environments”, Computers & Industrial Engineering, pp. 233 – 246.

J. Tompkins, Y. Bozer, E. Frazelle, J. Tanchoco, and J. Trevino. (2003). “Facility Planning”, John Wiley and Sons, New York.

H. Huang. (2003). “Facility Layout Using Layout Modules”, The Ohio State University.

L. Yang, J. Deuse, and M. Droste. (2011). “Energy Efficiency at Energy Intensive Factory - A Facility Planning Approach”, Chair of Industrial Engineering, TU Dortmund University, Dortmund, Germany, pp. 699.

E. S. Grajo. (1996). “Strategic Layout Planning and Simulation for Lean Manufacturing a Layout Tutorial”, In Proceedings of the 1995 Winter Simulation Conference, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, pp. 564-568.

E. E. Aleisa, and L. Lin. (2005). “For Effective Facilities Planning: Layout Optimization Then Simulation, Or Vice Versa”, Proceedings of the 2005 Winter Simulation Conference, pp. 1381-1383.

J. Banks, J.S. Carson, B.L. Nelson and D.M. Nicol. (2010). “Discrete-Event System Simulation”, Pearson, 5th ed.

R.G. Ingalls. (2002). “Introduction to Simulation”, Proceedings of the Winter Simulation Conference.




DOI: http://dx.doi.org/10.33021/jie.v3i2.523

DOI (PDF): http://dx.doi.org/10.33021/jie.v3i2.523.g326

Refbacks

  • There are currently no refbacks.



Articles in this journal have been indexed in major research databases, including:


Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.