Optimasi Kapasitas Produksi Assembly Line LED Downlight PT. DEF
Abstract
Full Text:
PDFReferences
Boysen, N., Fliedner, M., & School, A. (2007). A Classification of Assembly Line Balancing Problems. Europan Journal of Operation Research , 183.
Desfiasri, R. (2014). Analisis Peningkatan Kapasitas Produksi Assembly Line PT.DEF, Skripsi, Jurusan Teknik Industri, Universitas Presiden.
Elsayed, E. A., and Boucher, T. O. (1994). Analysis and Control of Production Systems (2nd Edition ed.). Englewood Cliffs, New Jersey: Prentice Hall International, Inc.
Grous, A. (2013). Analysis of Reliability and Quality Control : Fracture Mechanics 1. Hoboken, New Jersey: John Wiley and Sons.
Niebel, B., & Freivalds, A. (2009). Niebel's Methods, Standards and Work Design (12th edition ed.). New York: McGraw Hill International Edition.
Purnomo, Hari. (2004). Pengantar Teknik Industri. Edisi Kedua. Yogyakarta: Graha Ilmu, 2004.
Sutalaksana, I. Z., Anggawisastra, H. R., & Tjakraatmadja, J. H. (2006). Teknik Perancangan Sistem Kerja. Bandung: Institut Teknologi Bandung.
Wignjosoebroto, S. (2008). Ergonomi Studi Gerak dan Waktu : Teknik Analisis untuk Peningkatan Produktivitas Kerja. Surabaya: Guna Widya.
DOI: http://dx.doi.org/10.33021/jie.v1i1.24
DOI (PDF): http://dx.doi.org/10.33021/jie.v1i1.24.g25
Refbacks
- There are currently no refbacks.
Articles in this journal have been indexed in major research databases, including:
This work is licensed under a Creative Commons Attribution 4.0 International License.